|
|
|
BlueCielo Meridian Global Collaboration Framework 2012 SP1 Administrator's Guide | BlueCielo ECM Solutions |
After the settings in the .ini files have been configured, each processor can be scheduled to run on a periodic basis using Windows Task Scheduler. There should be the following scheduled tasks for each collaborating site:
To schedule the processors:
Tip If the export and import processors for the collaborating sites reside on the same computer, the export and import tasks may be combined into a single scheduled task that runs one batch file that executes each processor in turn, first the export processor and then the import processor. An example of this configuration is when a Meridian Enterprise vault is collaborating with a SharePoint server using GCF/SharePoint and the servers reside at the same physical location and share a GCF computer. In that case, no briefcase transfer between the computers running the export and import processors can occur that might result in a delay in the availability of the briefcases to the import processor. This method results in a total of two scheduled tasks (one for each direction between both sites) instead of four (two for each direction between both sites).
Warning The processors each check whether a previous instance of the processor is already running. If so, the new instance of the processor will exit silently. This enables scheduling the immediate processes with a short time interval without the risk that multiple instances will run simultaneously and interfere with each other. As a consequence, processing will stop when an instance does not exit due to an error or some other reason. We recommend that you configure the scheduled tasks to terminate if they run for an unreasonable amount of time, for example, five hours. For information on configuring Windows Task Scheduler, see the Windows Help.
When you are finished scheduling the processors, GCF installation and configuration is complete. For advanced configuration and integration with existing configurations and customization, see Configuring with VBScript.
Related tasks
Configuring the vault scheduled import task
Copyright © 2000-2012 BlueCielo ECM Solutions |